Getting ready for fiber: a homeowner’s checklist.

Understand what a fiber passing means, share important property details, and prepare for the steps between construction and your final connection.

Updated October 18, 2026 · 3 min read

A passing is not an installation appointment

A fiber line along the road is an important step, but it does not necessarily mean your home is ready to connect today. Main-line construction, splicing, testing, and the connection from the network to your home are separate stages.

Use the address checker and confirm the selected address. If the result shows a fiber passing, ask DMCI to confirm readiness for your property. A missing or uncertain record means the team needs to verify it; it is not a definitive statement that no service is possible.

Before work reaches your property

DMCI’s process includes an underground questionnaire and a review of the route to your home. Let the team know about private features that may not be marked by crews identifying public underground utility lines.

  • Invisible dog fences and irrigation or sprinkler lines.
  • Private propane lines and electrical lines to outbuildings.
  • Other private underground features you know about.
  • Gates, pets, access restrictions, and areas the crew should discuss with you.

Do not guess at the exact location of a buried line if you are unsure. Tell the team what you know and what you do not know. Do not start digging, relocate markings, or remove flags to prepare for the visit.

What happens during the build

Crews prepare the route and mark public underground services before digging. Main-line work can include conduit, hand holes, and fiber-optic cable, followed by splicing and testing. The drop to your home is a separate part of connecting your property.

Work may take more than one visit. Required markings, route conditions, weather, and remaining construction stages can affect timing. Ask for an update specific to your address rather than treating a map color or nearby activity as a promised completion date.

Prepare for the final in-home visit

Confirm the appointment and any access requirements with the scheduling team. An adult needs to be present for the final in-home installation and activation. Discuss where equipment will go and how the installer can reach the relevant area; do not move provider equipment or prepare wiring yourself.

First service payment is due at installation according to DMCI’s published construction information. Confirm your applicable plan, charges, and agreements with the team. Submitting website interest does not sign an agreement, activate service, or reserve an installation date.

Ground restoration and follow-up

DMCI’s published process includes compacting and leveling around hand holes, removing excess dirt, and seeding disturbed areas. If an area needs additional attention, contact the ground repair team through the construction page or call 877-936-2422.

Have the service address, a description of the affected area, and the approximate work date ready. Photos can help explain the issue when the team provides an appropriate way to send them. Do not attempt repairs around buried utilities yourself.